Kinook Software Forum

Go Back   Kinook Software Forum > Ultra Recall > [UR] Suggestions
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-14-2005, 11:46 AM
xja xja is online now
Registered User
 
Join Date: 01-06-2005
Posts: 146
Calendar pane to schedule tasks

This one may be asking for a lot, but it would make UR so much more powerful as a planning tool rather than just an information manager. What I am looking for is a better way to schedule tasks.

I would like to see a pane that contains a Calendar control (ie, that looks like the Daily and Work Week views in Outlook... maybe there is a 3rd party control available?). It would work as follows:

- drag an Info Item (such as a Task) on the Calendar control to create an Event Info Item that is shown on the Calendar, is linked to that Info Item and has Start Date/Time and End Date/Time attributes based on where on the control it was dropped. Start/End times of the Event would be changeable by dragging the event and/or its borders (like in Outlook).

- some indicator on the Task Info Item that shows that it is scheduled (maybe an indicator on the icon?)

- when Outlook Synchronization is implemented, synchronize all Event Info Items with the Calendar

Alternatively, it might better if rather than creating a separate linked Event Info Item, the Task Info Item was just "scheduled" with a Start/End time assigned (but still synchronized to an Event in Outlook). And the Calendar pane displayed all "scheduled" info items.

Simple, right?
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 01:02 AM.


Copyright © 1999-2023 Kinook Software, Inc.