View Single Post
  #4  
Old 04-29-2008, 10:29 AM
kinook kinook is online now
Administrator
 
Join Date: 03-06-2001
Location: Colorado
Posts: 6,027
See the attached sample. If the 'test' step fails to build, the 'Handle test failure' failure subroutine will be built, and the build will continue with the next project step.

http://www.visualbuild.com/Manual/stepfailure.htm
http://www.visualbuild.com/Manual/failurestepstab.htm
http://www.visualbuild.com/Manual/steppanes.htm
Attached Files
File Type: bld stepfailure.bld (1,021 Bytes, 1058 views)
Reply With Quote