View Single Post
  #6  
Old 07-05-2007, 10:51 AM
ambalboa ambalboa is online now
Registered User
 
Join Date: 06-25-2007
Location: Houston, TX
Posts: 70
Interesting. I looked at the VStudio.bld sample and looked at the failure steps. It seems the Undo Checkouts are build only if the 'Checkout' action step fails. How can the 'Undo Checkout' be build for when a checkout, project build or any other action step between a checkout and a checkin fails? Meaning, a checkout is successful but before it's checked back in, a failure occurs, so a undo checkout occurs to start again. Would that be a good thing to add to a project?
Reply With Quote